
BluePi Implements BCP with HA & DR for ChannelPlay
BluePi successfully implemented a Business Continuity Plan (BCP) with High Availability (HA) and Disaster Recovery (DR) capabilities for ChannelPlay.

ChannelPlay
Client
Manufacturing
Industry
Data Platform
Services

Enhanced business continuity
Key Result
The Challenge
Limited disaster recovery capabilities
Existing infrastructure lacked robust DR solutions, leaving ChannelPlay vulnerable to outages and data loss.
Insufficient high availability
Single points of failure existed within the infrastructure, potentially leading to service disruptions and impacting client operations.
Business continuity concerns
Absence of a comprehensive BCP raised concerns about ChannelPlay's ability to recover from unforeseen events.
Our Solution
DR with RPO and RTO under an hour
Ensured minimal impact on operations and data loss in case of disasters.
Multi-tier architecture
Decoupled application tiers for web, app, and database for improved scalability and resilience.
Multi-AZ deployments
Increased availability by distributing workloads across geographically separated Availability Zones.
Zero downtime and data loss migration
Seamless transition to cloud with minimal disruption to existing operations.
Secure infrastructure
Segregated network subnets, VPN Tunnel access, and IAM access controls for enhanced security.
Business Impact
Enhanced business continuity
BCP with HA and DR capabilities ensured business resilience and minimized service disruptions.
Improved operational efficiency
Multi-AZ deployments and decoupled architecture increased application availability and performance.
Reduced costs
Scalability and resource utilization optimization led to cost savings.
Enhanced security
Robust security measures ensured data protection and compliance with industry standards.